

Structural steel fabrication & installation — Melbourne & regional Victoria.
From small loading docks to 47-tonne plant platforms — same crew, same standards, since 2014.
Trusted by INTREC Management · Building Engineering · Plan Group · Bowden Corp · Connected Workplaces · DNAco · Arete Australia
What We Do
Structural steel, start to finish.
Fabrication, delivery, and installation across Melbourne metro and regional Victoria.
Commercial
Clear-span trusses up to 36m, plant platforms, multi-level erection, rooftop terraces.
Learn more →Fit-outs & Renovations
Internal steelwork, adaptive reuse, tight-access installs into existing structures.
Learn more →Domestic
All sizes welcome. Small jobs get the same crew and same standards as the big ones.
Learn more →12+
Years
25+
Recent Projects
670+
Tonnes Erected
4
Fab Premises
VIC-wide
Metro + Regional
Our Work
Recent Projects

Latrobe University — Thomas Cherry Building (Plant Platform)
INTREC Management · Bundoora
42m × 9.7m plant platform — 47 tonnes, part of a 180-tonne total project scope. Vicsteel's biggest plant platform to date.

Chisholm Institute — Dandenong Tech School (Completion)
Building Engineering · Dandenong
Completed steelwork over angled/curved concrete panels, captured by drone. Erected in record time with next to no site modifications required.

Kingfield Equipment Galvanising Furnaces — Turkey
Kingfield Equipment · Melbourne
1 of 7 galvanising furnaces. Bolt-together design, painted and insulated, shipped to a new galvanising plant in Turkey.

Woodend Antivenom Facility (Structure)
Arete Australia · Woodend
~75 tonnes of structural steel. Three-crane mix: 7-tonne bubble crane, 35-tonne mobile crane, 3-tonne telehandler.

818 Bourke Street, Docklands
Intermain Vic · Docklands
~50 tonnes of structural steel and perimeter balustrading, erected to rooftop Level 10. Water views.

Tweddle Early Learning Centre
Bowden Corp · Footscray
~65 tonnes of structural steel. 5 semi-loads delivered plus a galvaniser load. New client relationship with Bowden Corp.

From the job site
"Erected in record time with next to no site modifications required."
Chisholm Institute — Dandenong Tech School